AIRPORT OF SALENTO
The new Airport of Salento is a structure of great strategic importance to the service of a very wide which includes, in addition to the province brindisina, that of Lecce and a good part of that of Taranto. The Airport of Salento assumes, as articulated transport system in the region, is fundamental and can be considered for all intents and purposes port of privileged access to the territory of a strong tourist vocation. This important structure allows the dramatic improvement of standards of quality of services rendered.
Following a brief tab of
AIRPORT ADJUSTMENT:
A) Enlargement of passengers airport
• area on acceptance and sorting system and new control luggage departure;
• area security controls;
• salt boarding Schengen and non Schengen with related services and creation of restricted area dedicated to shopping areas (bars, shops, duty free shops);
• arrival area with reinforcement system return luggage;
• creating new commercial areas;
B) Reconfiguration of roads and car parks land-side
GENERAL METRIC DATA OF WORK PASSENGERS ENLARGEMENT DRAFT REALISED:
SURFACE DECK P. INTERRATO mq.1.430
SURFACE DECK P. LAND: mq.8.380
SURFACE DECK 1 ° FLOOR: mq.3.700
SURFACE DECK PALAZZINA AUTONOLEGGIATORI sqm. 385
TOTAL AREA sqm. 13,895
SEATS IN ACCEPTANCE-CHEK: 17 desks
WAITING DEPARTURES, SALE OF BOARDING 8 gates
WITHDRAWAL LUGGAGE 3 tapes
MISSION
The main purpose has been to improve standards of service, operational and functional on call. The expansion was achieved with the addition of new buildings along the four sides of the former airport, a plan on long sides and two floors tested on court. For prospectuses has been identified a solution without compromise and decided to search for a open space . For sides, however, was built a new structure with triangular portals in tubular steel, cross-pillar approach to existing alternating with high steel technology.
This type of facade chosen, as well as allow better control of microclimate and better comfort, allows a reduction of about 30% of energy needs. In addition to a strong formal characterization of the building, with recognizable aspect solid and durable, has exalted the idea of "place" not only for passage, but also meeting and exchange.
A large roofing panels rolled aluminum helps to draw the line posting coverage along the entire front road, allowing protection from the elements at the arrivals and departures. The technical requirements adopted for the project were all aimed a safe building , efficient and pleasant to live for all users, occasional and ongoing.
RECONFIGURATION OF ROAD 'PARKING AND LAND-SIDE
The road access to the airport and allocation of spaces for parking cars and stationary bus were totally inadequate for a period of traffic forecasts from 2007 upto 2017. With the new project was decide to bring at new parking system and bigger spaces, creating a ring distribution that allows greater fluidity of movement and a better understanding of space and functional hierarchies of traffic. All bordature roads and rows of parking spaces, as well as to the road, are arranged in green with a careful selection of plant of this area.
CURIOSITY
We give below some curiousity data related to specific quantities of material used and types of work carried out:
- 32,600 cubic meters of excavation
- 3,100 cubic meters of concrete
- 300 tons of iron worked
- 110 tons of metal carpenters
- 5 scale new groups
- 8800mq of flooring
- 1200mq structural glass
- 3500mq wall furniture
- 5.000mq coating aluminium zinc
- 28.000mq of asphalt
- 5.000mq and patterns of green
- 2.000mq of self for sidewalks
- 1900mq of basole limestone for sidewalks
- 7.100mq of false
- 1.1 km of pipes to collect rainwater
- 40 km of electric cables
- 1 km of pipes for fire-fighting system
- 1 disoilator by 15> 750l / s
- 2 emergency generators from 640KVA
- 1 cabin processing MT / BT
- 960 ceiling lights
- 350 recessed spotlights
- 40 switchboards
- 2 heat pumps from 574KW yield cooling and 634 KW thermal yield
- 2 UTA from 1528 l / s and 6369 l / s
- 64 tons of iron pipes for thermal plantsmici
- 22 tons of pipes for conditioning
- 150 units terminal airconditioning
- 1.5 km of pipes for sewerage plant
- 5 shutdown plant with argon



|